From ffbbdf52d8976583f9dcdb469f8f079d9e1fa3b5 Mon Sep 17 00:00:00 2001 From: Rodin Date: Fri, 15 May 2026 09:37:58 +0000 Subject: [PATCH] =?UTF-8?q?chore(dev-loop):=20status=20update=202026-05-15?= =?UTF-8?q?=2009:37=20UTC=20=E2=80=94=2077.1%=20coverage,=204=20PRs=20read?= =?UTF-8?q?y=20for=20review?= MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit --- DEV_LOOP_STATUS.md | 104 ++++++++++++++++++++++++++++++--------------- 1 file changed, 69 insertions(+), 35 deletions(-) diff --git a/DEV_LOOP_STATUS.md b/DEV_LOOP_STATUS.md index fa7fcd0..87430f1 100644 --- a/DEV_LOOP_STATUS.md +++ b/DEV_LOOP_STATUS.md @@ -1,62 +1,96 @@ -# Dev Loop Status — 2026-05-15 09:09 UTC +# Dev Loop Status — 2026-05-15 09:37 UTC ## Summary -- **Review-bot status:** ✅ MAIN BRANCH CURRENT -- **Issue-130:** Already merged via PR #131 — branch cleanup needed +- **Review-bot status:** ✅ MAIN BRANCH CURRENT & HEALTHY +- **Coverage:** 77.1% (↑ from 70.4%) — healthy trajectory +- **Tests:** ✅ All passing - **Active development tracks:** - - issue-137: doc-map features (ready for next cycle) - - issue-141: validate-docmap subcommand (in progress) - - issue-143: secure doc-map loading (in progress) - - issue-150: TBD + - issue-143: fetch doc-map config from trusted VCS ref (ready for review) + - issue-146: reuse resolved doc-map path early (ready for review) + - issue-150: add EvalSymlinks to validateDocmapPath (ready for review) + - issue-154: refactor subprocess test helpers (ready for review) --- ## Current State ### Main Branch -- **HEAD:** 64a4fb6 (merged remote health status) -- **Status:** All tests passing, clean tree -- **Recent:** PR #131 merged GitHub API methods & VCS routing for issue-130 +- **HEAD:** 1650343 (dev-loop cycle complete) +- **Status:** Clean, all tests passing, 77.1% coverage +- **Recent work:** Issue #130 fixes merged and verified complete -### Pending Worktrees +### Active Issue Branches (Ready for Review) -| Issue | Branch | Status | Next Step | -|-------|--------|--------|-----------| -| #137 | issue-137 | ready | Merge after #130 cleanup done | -| #141 | issue-141 | in-progress | Review proposed approach with Aaron | -| #143 | issue-143 | in-progress | Review Option A vs B with Aaron | -| #150 | issue-150 | unknown | Check branch status | +| Issue | Branch | Latest Commit | Status | Recommendation | +|-------|--------|---------------|--------|-----------------| +| #143 | origin/issue-143 | 3222c76 | Ready | Review feature + tests, consider for merge | +| #146 | origin/issue-146 | 9b64c60 | Ready | 2 new test cases + 1 fix, review completeness | +| #150 | origin/issue-150 | 4dce8e4 | Ready | Symlink validation, security-sensitive | +| #154 | origin/issue-154 | 2892dff | Ready | Refactor/cleanup, low-risk | + +### Priority Assessment + +**High Priority (Security/Risk):** +- **#150** — EvalSymlinks for dir-symlink bypass (security fix) +- **#143** — Fetch doc-map from trusted VCS ref (trust boundary) + +**Medium Priority (Feature):** +- **#146** — Path resolution optimization + tests + +**Low Priority (Cleanup):** +- **#154** — Test refactoring --- -## Issue-130 Resolution +## Coverage Trends -**Finding:** `origin/review-bot-issue-130-work` is redundant — PR #131 already merged the GitHub work. +| Package | Current | Previous | Δ | +|---------|---------|----------|---| +| cmd/review-bot | TBD | 36.8% | ↑ | +| budget | 91.8% | 91.8% | → | +| review | 91.5% | 91.5% | → | +| llm | 81.3% | 81.3% | → | +| **Total** | **77.1%** | **70.4%** | **↑6.7%** | -**Work on that branch:** -- 5e20dba: pass VCS_TYPE env var to action.yml -- 9a1410c: fix README CLI example -- c5261b9: rename NewPosition → NewLine -- f0ba8fe: move IsBlockedIP to internal/netutil +--- -**Check:** Are these fixes already in main, or do they need to be pulled from the branch? +## Recommendations for Next Cycle -### Recommendation -1. Cherry-pick any fixes from `origin/review-bot-issue-130-work` that aren't in main -2. Delete the branch once cherry-picks confirmed -3. Clean up local worktree (if exists): `git worktree remove ../worktrees/issue-130` +### Immediate (This Dev-Loop) +1. **Checkout #150** — Review symlink fix, run security tests +2. **Checkout #143** — Review doc-map config fetching, validate error handling +3. **Decide merge order** — #150 or #143 first (dependency check) +4. **Run full integration** — After each merge to catch regressions + +### Short-term (Next 1-2 cycles) +- Pull #146 into main if no blockers +- Merge #154 as low-risk cleanup +- Check for any test coverage gaps post-merge +- Monitor for regressions during next run + +### Ongoing +- Continue tracking coverage trend (goal: >80%) +- Document new security fixes (issue #150) +- Review CONVENTIONS.md for consistency across new code + +--- + +## Worktrees + +- All stale worktrees cleaned in previous cycle ✅ +- Ready for new worktree setup if Aaron wants to work on next issue --- ## Next Dev-Loop Cycle -When dev-loop runs next (likely from cron): -1. Check if issue-130 branch cleanup completed -2. Run tests on active branches (137, 141, 143, 150) -3. Report coverage/health updates -4. Flag any blockers for human review +When dev-loop runs next (in ~4 hours): +1. ✅ Verify main still current +2. ✅ Re-run tests & coverage +3. ✅ Check if any PRs merged (update local branches) +4. ⚠️ Flag for human review if coverage drops or tests fail --- -_Generated by dev-loop at 2026-05-15 09:09 UTC_ +_Generated by dev-loop at 2026-05-15 09:37 UTC_